|
INSTALLATION INSTRUCTIONS
The entire installation should take only
10-20 minutes
Before installing screen : Make
sure this screen will cover your opening.
Fastenener Instructions:
Make sure area is dry and clean. For best results apply during
50 degree to 70 degree temperature
| 1. Unfold screen
and hold up to area you will be mounting to. |
 |
| 2. Draw a line
around border of your framing area that you will be mounting
fastener and screen to. |
 |
| 3. Start at one
corner and peel backing from fastening tape 8 to 12 inches
at a time. Apply firm pressure to fastening tape with
enclosed plastic spatula. Continue with fastening tape on
other 3 sides. |
 |
Caution :Be
careful fastening tape can cut your skin.
Screen installation:
|
1. Press 10 - 12 inches of screen at a
time onto fastening tape using spatula. |
 |
|
2. Press entire screen on fasting tape.
After completing take roller wheel and roll screen into the
fastening tape hooks. |
 |
|
3. You can now take fastening sealer
and press on over the hook and screen with spatula |
|